902_BLACKSPOT_2021-01-01 Bucharest Boulevard is one of the conflicting places in the city of Giurgiu, in terms of road safety. For the last 5 years more than 50 incidents have been registered on it, most of them with pedestrians. High speed and lack of barrier facilities are the two main factors identified as the reason for this high intensity of accidents. The positioned black dot applies to the entire section of the boulevard north of the intersection with Daciei Boulevard.
Favorites : Places
The project “Improved nodes Giurgiu-Byala for better connection to TEN-T infrastructure” / „Îmbunătățirea nodurilor Giurgiu-Byala pentru o conectare mai bună la rețeaua infrastructurii TEN-T” (The project) aims to improve the transport system through effective connection of secondary and tertiary nodes Giurgiu and White with the main and comprehensive TEN-T transport network.
The project activities are included in the priority axis of the Program №1: “Well-connected region”, specific objective № 1.1: Support for the planning, development and coordination of cross-border transport systems to improve the connections with the TEN-T transport network.
The specific objectives of the project are:
Specific objective №1: Improving the transport infrastructure to better connect to the core and comprehensive TEN-T network in order to make it easier and safer to transport users.
Specific objective №2: Development of a joint traffic management system for "smart mobility" in the Giurgiu-Biala cross-border region.
Specific objective №3: Upgrading public experience and knowledge in the field of safe traffic measures in the Giurgiu-Byala cross-border area for better coordination of the transport system.
The challenges addressed by the Project are the underdeveloped road infrastructure with a high risk of accidents, leading to increased travel time, operating costs for vehicles, accidents and environmental damage.
The project envisages the implementation of the following activities:
Activity 1: Project preparation
Activity 2: Ensuring the overall management of the project
Activity 3: Information and publicity of the project
Activity 4: Engineering - technical design and rehabilitation of streets in Byala Municipality
Activity 5: Carrying out construction and installation work in Giurgiu County
Activity 6: Creation of an integrated traffic monitoring system
Activity 7: Explanation campaign for the traffic management system
Activity 8: Introduction of an integrated awareness system for road safety measures.