903_BLACKSPOT_2021-01-01 Municipal road DJ601 is neither very busy nor can high speed be developed on it. However, a black spot has been identified due to the increasing number of incidents - over the last three years over twenty. Most incidents are due to loss of control of the vehicle or improper crossing of pedestrians. In car accidents, again, most accidents are in the dark part of the day - due to alcohol use and loss of concentration (due to distraction from mobile phones). Another important factor is the proximity of the city of Bucharest and the many residents who travel to and from work early in the morning and late in the evening. In 2019 and 2020, the number of road accidents is increasing.
Favorites : Places
The project “Improved nodes Giurgiu-Byala for better connection to TEN-T infrastructure” / „Îmbunătățirea nodurilor Giurgiu-Byala pentru o conectare mai bună la rețeaua infrastructurii TEN-T” (The project) aims to improve the transport system through effective connection of secondary and tertiary nodes Giurgiu and White with the main and comprehensive TEN-T transport network.
The project activities are included in the priority axis of the Program №1: “Well-connected region”, specific objective № 1.1: Support for the planning, development and coordination of cross-border transport systems to improve the connections with the TEN-T transport network.
The specific objectives of the project are:
Specific objective №1: Improving the transport infrastructure to better connect to the core and comprehensive TEN-T network in order to make it easier and safer to transport users.
Specific objective №2: Development of a joint traffic management system for "smart mobility" in the Giurgiu-Biala cross-border region.
Specific objective №3: Upgrading public experience and knowledge in the field of safe traffic measures in the Giurgiu-Byala cross-border area for better coordination of the transport system.
The challenges addressed by the Project are the underdeveloped road infrastructure with a high risk of accidents, leading to increased travel time, operating costs for vehicles, accidents and environmental damage.
The project envisages the implementation of the following activities:
Activity 1: Project preparation
Activity 2: Ensuring the overall management of the project
Activity 3: Information and publicity of the project
Activity 4: Engineering - technical design and rehabilitation of streets in Byala Municipality
Activity 5: Carrying out construction and installation work in Giurgiu County
Activity 6: Creation of an integrated traffic monitoring system
Activity 7: Explanation campaign for the traffic management system
Activity 8: Introduction of an integrated awareness system for road safety measures.