904_BLACKSPOT_2021-01-01 As on the DJ601 road, so this district road - DJ412 has a high load of road accidents. Here, however, traffic is the main factor in identifying the area as a black spot. The road is often used to bypass the main first-class roads from Bucharest to Giurgiu / Bulgaria and back. The area is urbanized and there are residential buildings along almost the entire road section, which is why there are many accidents with pedestrians. Another unfavorable factor is the proximity of the Arges River, which often leads to fog in spring and autumn, and in winter is the cause of ice. However, trafficking and urbanization remain the main factors behind the high concentration of incidents.
Favorites : Places
The project “Improved nodes Giurgiu-Byala for better connection to TEN-T infrastructure” / „Îmbunătățirea nodurilor Giurgiu-Byala pentru o conectare mai bună la rețeaua infrastructurii TEN-T” (The project) aims to improve the transport system through effective connection of secondary and tertiary nodes Giurgiu and White with the main and comprehensive TEN-T transport network.
The project activities are included in the priority axis of the Program №1: “Well-connected region”, specific objective № 1.1: Support for the planning, development and coordination of cross-border transport systems to improve the connections with the TEN-T transport network.
The specific objectives of the project are:
Specific objective №1: Improving the transport infrastructure to better connect to the core and comprehensive TEN-T network in order to make it easier and safer to transport users.
Specific objective №2: Development of a joint traffic management system for "smart mobility" in the Giurgiu-Biala cross-border region.
Specific objective №3: Upgrading public experience and knowledge in the field of safe traffic measures in the Giurgiu-Byala cross-border area for better coordination of the transport system.
The challenges addressed by the Project are the underdeveloped road infrastructure with a high risk of accidents, leading to increased travel time, operating costs for vehicles, accidents and environmental damage.
The project envisages the implementation of the following activities:
Activity 1: Project preparation
Activity 2: Ensuring the overall management of the project
Activity 3: Information and publicity of the project
Activity 4: Engineering - technical design and rehabilitation of streets in Byala Municipality
Activity 5: Carrying out construction and installation work in Giurgiu County
Activity 6: Creation of an integrated traffic monitoring system
Activity 7: Explanation campaign for the traffic management system
Activity 8: Introduction of an integrated awareness system for road safety measures.